The wisteria trellis was finished at the start of 2005.
The mural up until the end of 2004.
April 04 saw the addition of the Wisteria Trellis and sculptured garden area.
A bridge is placed in front of this panel with a pond and floating ducks.
The tulip fields actually look like they follow you as you walk by.
Horizon line and multiple perspective points are established.
Panels 5-7 are hung out in the main barn to be painted on Feb. 04 – April 04.
Additional display items are placed in front and hooked up to pumps or electricity.
Each panel is hung and then fastened together with velcro.
Painted panels 1-4 are moved out to the main barn January 04.